{"id":6990,"date":"2026-02-09T12:35:36","date_gmt":"2026-02-09T11:35:36","guid":{"rendered":"https:\/\/www.dev-360.de\/?p=6990"},"modified":"2026-03-18T17:43:14","modified_gmt":"2026-03-18T16:43:14","slug":"neubau-trafostation-fuer-die-patch-barracks-stuttgart","status":"publish","type":"post","link":"https:\/\/www.zn-architekten.de\/en\/neubau-trafostation-fuer-die-patch-barracks-stuttgart\/","title":{"rendered":"Repair power supply ,Patch Barracks, Stuttgart"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The task includes the planning and construction management for the new construction of a transformer station with 4 transformers, low-voltage distributors, medium-voltage distributors and an emergency power system. The new transformer station complements the adjacent old station. The existing power lines are to be laid to the new transformer station. Furthermore, the existing buildings, including the excavation work for cable trenches and house entrances, are to be reconnected.<br><br>HOAI phases 3-8<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>","protected":false},"excerpt":{"rendered":"<p>Die Aufgabe umfasst die Planung und die Bauleitung f\u00fcr den Neubau einer Trafostation mit 4 Transformatoren, Niederspannungsverteiler, Mittelspannungsverteiler sowie einer Netzersatzanlage. Die neue Trafostation erg\u00e4nzt die nebenliegende alte Station. Die bestehenden Stromleitungen sollen zur neuen Trafostation verlegt werden. Weiter sollen [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":8092,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[81],"tags":[],"class_list":["post-6990","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrie-und-gewerbebauten"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/posts\/6990","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/comments?post=6990"}],"version-history":[{"count":8,"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/posts\/6990\/revisions"}],"predecessor-version":[{"id":8141,"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/posts\/6990\/revisions\/8141"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/media\/8092"}],"wp:attachment":[{"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/media?parent=6990"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/categories?post=6990"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zn-architekten.de\/en\/wp-json\/wp\/v2\/tags?post=6990"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}