The task includes the planning and construction management for the new construction of a transformer station with 4 transformers, low-voltage distributors, medium-voltage distributors and an emergency power system. The new transformer station complements the adjacent old station. The existing power lines are to be laid to the new transformer station. Furthermore, the existing buildings, including the excavation work for cable trenches and house entrances, are to be reconnected.
HOAI phases 3-8