The school was built according to the EnEV standard.
Decentralised ventilation units with heat recovery ensure good air quality inside and thus create optimal conditions for attentive listening and concentrated learning.
The interior design of the school is characterized by warm woods on the floor and façade, as well as differently designed exposed concrete with smooth and rough surfaces. Traces of work and formwork were deliberately accepted.
The outer façade was designed with a curtain brick façade based on the local and already existing materials.
| Client: | City of Sindelfingen |
| Services | HOAI phases 1-8 |
| Team: | Fiona Langensiepen, Vincent Glaser, Florian Wochele, Karl-Heinz Nagel, Jörg Zimmermann |
| Planning: | 08/2013 to 12/2015 |
| Construction time: | 04/2015 to 09/2016 |
| Usable area: | approx. 1,300 m² (usable area) |
| Construction costs: | approx. €4.60 million gross (KG 200-500) |
| Primary energy requirement: | 141.3 kWh/(m²a) |