Conversion and renovation of residential building R85, Stuttgart (BW)

Redesign and upgrade of the garden level access through the installation of a suspended ceiling with indirect lighting and natural stone flooring, Q4 plastering of ceilings and walls, renovation and modernization of the sanitary facilities with high-quality fixtures, installation of underfloor heating, and electrification of the windows. Redesign of the built-in wardrobes, cloakroom area, and doors. Conversion of the existing garden storage room into a wellness oasis with sauna, shower, and lounge area. Roof renovation of the former garden storage room. Renovation and modernization of the entire swimming pool technology and the heated outdoor pool through the installation of electric in-ground roller shutters, underwater spotlights, a counter-current system, etc., including the creation of a new whirlpool with various water features. Roof renovation and redesign of the roof terrace with the installation of landscaped planters. Very high standard.

Project details

Client: private
Services HOAI phases 1-8
Team: Jörg Zimmermann
Planning: 6 months
Construction time: 5 months
Completion: 07/2009
Construction costs: not specified